Oak Grove Elementary School This work was performed on Oak Grove Elementary School. The Job consisted on the North Hialeah Elementary School On this Project Blizzard Air Conditioning had to replace a 120 Ton Air Cool Chartwells Kitchen Pembroke Pines On this Project Blizzard Air Conditioning had to Installed Two (2) 20 Ton Split Replacement 80 Ton Dehumidifier This project was based on the replacement of an 80 ton 100% outside air