On this project, Two 60 Ton Air Cooled Chillers were installed.
All pipe insulation metal wrapped. Chilled water piping was welded and insulated.
New piping were flushed to insure proper chemical levels are maintained.
Removed and replaced chain link fence for installation.
Replaced rusted piping.
Provided new gauges and thermometers.
The new chiller was tied into the EMS system, with the chiller controlling the pumps including an interlock.
Coordinate with YORK(JCI) for the Chillers Start-up.